Hall Power installa LG a Ramacca
18 Jun
icona progetti.png
The Hall Power has built a plant in Ramacca in a field with 68 photovoltaic panels, the LG 290Wp exposed exactly to the south with an inclination of 20%. The inverters, PVI-TRIO-20.0-TL-S2X, was placed in a room under the panels with northern...
Elioplant S.r.l installa Trienergia
18 Jun
icona progetti.png
The Elioplant S.r.l has installed a system with Trienergia modules near Milan, with a total output of 3 kWp with 15 COE 200 MB. All materials were purchased from Coenergia srl in Bondeno of Gonzaga (MN).
I.E Service 2° conto energia
18 Jun
icona progetti.png
The I.E. Service has built a photovoltaic system with a total output of 200 kWp on the east / west slopes, the project was carried out with the 2nd Energy Bill and equipment in the boiler room with access to LV and LV / LV transformer. All...
I.E Service 3° conto energia
18 Jun
icona progetti.png
The i.e. Service has built a plant in a prefabricated structure for agricultural vehicles and warehouse storage, using the Sanyo 240 Wp modules placed on the roof level, and monitoring was performed with the device Intelly Green of 4-Nocs Zigbee....
I.E Service - LG 290 W
18 Jun
icona progetti.png
Architectural integration, made by I.E. Service, in the area affected by landscape restrictions using the LG 290 W modules and integrated it with the POWER ONE inverter. The construction of the new roof has enabled the plant to be built at an...
I.E Service - LG 290 W su casa colonica
18 Jun
icona progetti.png
Made photovoltaic system, from I.E. Service, of a farmhouse, the particular linear geometry and the laying on the body hides the coplanarity of photovoltaics, making it appear almost architectural integration. The materials used are the LG 290W,...