The Hall Power has built a plant in Ramacca in a field with 68 photovoltaic panels, the LG 290Wp exposed exactly to the south with an inclination of 20%. The inverters, PVI-TRIO-20.0-TL-S2X, was placed in a room under the panels with northern...
The Elioplant S.r.l has installed a system with Trienergia modules near Milan, with a total output of 3 kWp with 15 COE 200 MB. All materials were purchased from Coenergia srl in Bondeno of Gonzaga (MN).
18
Jun
The I.E. Service has built a photovoltaic system with a total output of 200 kWp on the east / west slopes, the project was carried out with the 2nd Energy Bill and equipment in the boiler room with access to LV and LV / LV transformer. All...
18
Jun
The i.e. Service has built a plant in a prefabricated structure for agricultural vehicles and warehouse storage, using the Sanyo 240 Wp modules placed on the roof level, and monitoring was performed with the device Intelly Green of 4-Nocs Zigbee....
18
Jun
Architectural integration, made by I.E. Service, in the area affected by landscape restrictions using the LG 290 W modules and integrated it with the POWER ONE inverter. The construction of the new roof has enabled the plant to be built at an...
Made photovoltaic system, from I.E. Service, of a farmhouse, the particular linear geometry and the laying on the body hides the coplanarity of photovoltaics, making it appear almost architectural integration. The materials used are the LG 290W,...