TW-TeamWare CCI
Datasheet e Manuals
- CARATTERISTICHE_QUADRO_CCI-TW151-DWCB-0012-00_IT.pdf
- DATASHEET_TEAM_WARE_GTS-9010_IT.pdf
- DATASHEET_TEAM_WARE_PM-3033(-MTCP)(-CPS)_EN.pdf
- DATASHEET_TEAM_WARE_WALLY_CCI_IT.pdf
- DISEGNO_TECNICO_TEAM_WARE_QUADRO_CCI_IT.pdf
- MANUALE_TEAM_WARE_CCI_IT.pdf
- REGISTRI_MODBUS_TEAM_WARE_CCI.pdf
- SCHEMA DI CONNESSIONE E VISTE QUADRO_TW151-DWCB-0125-00_F1_Dig In 24 V.pdf
- SCHEMA DI CONNESSIONE E VISTE QUADRO_TW151-DWCB-0125-00_F2_Dig In 24 V.pdf
- SCHEMA DI CONNESSIONE E VISTE QUADRO_TW151-DWCB-0125-00_F3_Dig In 24 V.pdf
- SCHEMA_ELETTRICO_TEAM_WARE-TW151-DWCB-0012-00_IT.pdf
TW-TeamWare CCI
The CCI – Central Plant Controller by TW-TeamWare is a combined hardware/software device with the function of “Active power limitation on external DSO command” for driving inverters (PF2). It enables the grid operator to monitor the plant, manage it, and communicate with it effectively.
Inside the CCI panel you will find:
GPS Time Synchro Receiver, supporting simultaneous tracking of up to 22 channels and synchronization capability for up to 10 devices.
PM-3033/-MTCP/-CPS, the three-phase smart power meter that provides access to real-time electrical consumption data for three-phase power measurement.
PM-3033/-MTCP/-CPS, the three-phase smart power meter that provides access to real-time electrical consumption data for three-phase power measurement.
Coenergia Code:
TEAMW-QUADRO-BT
TEAMW-QUADRO-BT
Compliance with the CCI is a key regulatory requirement:
- It ensures that photovoltaic systems operate safely
- It allows the plant to be monitored by the grid operator
- It preserves economic benefits and any ongoing incentives