13
Oct
FACTORY FOR INSPECTION AND REC REC JT JM
Oct 13, 2011
The reliability REC MADE in EU.
Even the forms of JT and JM REC Solar have been certified factory inspection that allows to benefit from the incentive 10%, as required by the guidelines of the Fourth Energy Bill.
Download the PDF below.